Hybrid Construction Surveying, Mapping and 3D Design

Here’s a cross-post from the Yuneec Pilots forum demonstrating the use of several different methods of surveying including flying the H520 with Emlid PPK to tackle a tough 10-mile road project. This project is new territory for DroneDeploy processing as it has been very challenging for the engine to process such a long narrow corridor. A good test for them to say the least.

hah, and Im struggling to create a 3D model of my small house :smiley:

1 Like